WeWork at 1 Central Plaza, Dublin
We Work Dublin
A campus rebuilt around light, sightlines and silence.
Client
Principle Contractor
Architect
Location
One Central Plaza, Dame Street, Dublin, D02 EF64
KPL Partner
The original building was the old Central Bank, of significance architecturally as part of the legacy of buildings around Dublin by renowned and sometimes controversial architect, Sam Stevenson. The refurbishment brings a new lease of life to the iconic building in the heart of Dublin City Centre.
This redeveloped former bank headquarters in Dublin is designed to be the base for more than 1,000 office workers. This €75m redevelopment on Dame Street includes a 300-seat rooftop restaurant and panoramic viewing deck for tourists and 12,000 sq m of offices, as well as shops in the adjoining buildings.
"We needed the partitioning to disappear — and where it had to be seen, to be precise enough to belong to the building."
— Project Architect, Arcadis
- We Work Dublin
The Design Brief
§02 — Specification
Komfort Systems
Three Komfort systems, calibrated to a single architectural language: gold steel, acoustic glass, and integrity ratings that disappear into the building.
01
DEF—EI30
Polar 30
single glazed
- Deflection head to cater for live / static loads +/- 25mm
- 12mm toughened safety glass 34dBRw
- Panes vertically dry bubble jointed
02
DEF—EI60
Sonik 70 Doors
hinged, single glazed, acoustic 34dBRw
03
POL—100
Sonik 70 Sliding Doors
single & double
Numbers, held quietly behind the glass.
We Work Dublin
′
Fire integrity rating
EI60 — minutes
k
Square feet partitioned
Across four floors
%
Polar 100 double-glazed
Acoustic performance
RIBA-shortlisted scheme
Education, 2024
We Work Dublin
Komfort Products Used
Scroll →
Challenges and Solutions
The Komfort Specification
- Next Project —
Read on.
St. Pancras Square — a 24-storey commercial fit-out delivered with British Airways Holidays at The Create Building, Crawley and bespoke privacy glazing.